Warning: The magic method Gallery_Video::__wakeup() must have public visibility in /home3/cp504663/public_html/product/wp-content/plugins/gallery-video/video-gallery.php on line 86

Warning: The magic method Hugeit_Slider::__sleep() must have public visibility in /home3/cp504663/public_html/product/wp-content/plugins/slider-image/slider.php on line 262

Warning: The magic method Hugeit_Slider::__wakeup() must have public visibility in /home3/cp504663/public_html/product/wp-content/plugins/slider-image/slider.php on line 264
Mega slider | TKK Corporation


About Mega slider

Mega slider that allows movement of the super heavy exceeding 50ton. From seismic isolation mechanism of the buildings in a smooth movement of the ball Unusual accuracy until the subtle change in the location of heavy contribution to society in a variety of fields.

Various fields, active in the applications

During an earthquake by using the mega slider to the bearing part of the building and the foundation, passing the shaking of the ground in the slide movement, greatly reduces the energy of the earthquake transmitted to the building.
Location changes and subtle positioning of heavy objects by attaching such as machinery and equipment also allows easy.

Mechanism of mega slider slides

Mechanism of mega slider slides

By supporting the transfer surface at a plurality of balls, it is now possible to receive a greater load in a space-saving.
Or to rotate the load material on the spot, because it is also subtle and precise movement of the front and rear, left and right? And diagonal to every direction, it has been utilized in a number of different types, a variety of applications.

AWS series

AWS series

PDF

AWS series

PDF


PDF

Please note the time of your use

  1. Transfer surface, you need a flat and high hardness as much as possible.
    (Recommended surface finish ▽▽▽ / quenching hardness HRC55 or more)
  2. Please note that you do not exceed the allowable load by considering the unbalanced load and the like.
  3. Please take into account that there is no adhesion of dust to the transfer surface.
  4. Maintenance at the time, please pay attention to the falling off of the ball.
  5. In order to prevent the ball falling in this product, it comes with a cover. After product installation, after about 2mm jack-up, remove the cover.
  6. (Since spilled the ball and lifted 2mm or more, please note.)
    ※ When mounting, please ensure the space for removing the cover.